-
3PE Anti-corrosion coating Line
- - Steel pipe inner wall sand blasting rust removal production line
- - Multi-position steel pipe external epoxy (external plastic coating) anti-corrosion coating line
- - Round-extrusion 3LPE coating line
- - Steel pipe inside and outside epoxy powder coating anti-corrosion production line (inside and outside coating plastic, FBE) anti-corrosion production line
- - Steel pipe internal and external liquid coating spraying anti-corrosion production line.
- - Steel pipeline joints internal coating Robot
- - Steel Pipe Outer Wall Shot Blasting line
- - Steel pipe internal shot blasting line
- - Steel pipe 3LPE anti-corrosion coating production line
- - Steel elbow 3PE anti-corrosion production line
-
Pre-Insulated Pipe Production Line
-
Rubber Foam Insulation tube/sheet Production Line
-
PE PP Sheet/film/Board Extrusion Line
- - Water-proof Coiled Material /GEO-membrane Film Extrusion Line
- - PE/PP/PS/HIPS/ABS Single extrusion & Multi-layer Sheet Co-Extrusion Line
- - Adhesive coating line of heat shrinkable sleeve
- - Fibre reinforced 3-layer PE cross-linked heat shrinkable sleeve backing film production line
- - PE Carbon Fibre Spiral Pipe Extrusion Line
- - PE PP Sheet/Board Extrusion Line
- - Electro-fusion girth welding joint closure production line
- - Heat Shrinkable Sleeve extrusion and Coating Line
-
Pipe Fittings
-
HDPE pipe production line
-
HDPE/PP Double Wall Corrugated Pipe Production Line
-
HDPE Hollow Wall Corrugated Pipe/ Structured Wall Pipe Extrusion Line
Three layer PE anti-corrosion equipment is an important equipment for anti-corrosion treatment of steel pipe. 3LPE anti-corrosion equipment has a supermatic, and under the appropriate parameter Settings, the anti-corrosion layer can be stably and evenly coated on the surface of the steel pipe, the coating & coverage quality is good, and the production efficiency is high, which can meet the demand of the mass production anti-corrosion of the steel pipe.
- introduction
- Features
- Technical parameters
- advantages
- Application scenarios
- Inquiry now
- Related products
The outer anti-corrosion layer of 3PE steel pipe is a anti-corrosion structure composed of a bottom layer of epoxy powder, an intermediate layer of adhesive, and an outer layer of polyethylene composite. It has the characteristics of high mechanical strength and excellent electrical insulation performance. The use of Huashida 3PE Steel Pipe Anti-corrosion coating Line has a high degree of mechanization, stable process parameters, and does not pollute the environment. Therefore, it has been widely applied in key pipeline anti-corrosion projects in recent years.
3LPE anti-corrosion equipment has a supermatic, and under the appropriate parameter Settings, the anti-corrosion layer can be stably and evenly coated on the surface of the steel pipe, the coating & coverage quality is good, and the production efficiency is high, which can meet the demand of the mass production anti-corrosion of the steel pipe. The quality of the 3 LPE anti-corrosion coating of the steel pipe is reliable, which can effectively prolong the working life of the steel pipe and improve its corrosion resistance.
PE Extruder PE cooling equipment
PE beveling equipment Steel pipe transmission equipment
Steel pipe transmission equipment 3PE production photos
3PE+internal epoxy anti-corrosion finished pipe Intermediate frequency heating coil
3PE anti-corrosion production line robot coding machine equipment Steel pipe transmission equipment
PLC control system
1.Reduce costs
High sealing performance can greatly save energy, reduce costs, and protect the environment when the equipment operates for a long time.
2. Long service life
The operation is convenient and simple, the equipment production speed is fast, and the service life can reach 30-50 years.
3. Good impact resistance
It also has good impact resistance under low temperature conditions
4. Good anti-corrosion effect
Epoxy has high strength, low water absorption of PE, good softness of hot melt adhesive, and high anti-corrosion reliability. The characteristics of this anti-corrosion method are simple production process, good anti-corrosion effect, and low price, which are widely recognized in the pipeline manufacturing industry as anti-corrosion methods.
5. Full automatic processing: PLC intelligent control system
The entire production line is equipped with a large number of sensors, which can statistically analyze position, speed, efficiency, and energy consumption, achieve automatic processing and high-precision stable processing, and ensure the accuracy of products and designs.
Production process
3pe installation and debugging
Production line parameters:
(1) pipe dia. range: 64mm-4200mm
(2) Processing capacity: ≥250㎡/h
(3) Cleanliness: Sa2.5
(4) Materials used: epoxy powder, adhesive, polyethylene
(5) Main equipment: steel pipe external blasting equipment, steel pipe conveyor system, intermediate frequency heating equipment, epoxy powder coating equipment, AD adhesive extrusion equipment, PE polyethylene extrusion equipment, cooling equipment, PE beveling equipment, print label equipment, etc
Product images
01 Awarded the first (set) technical equipment in Shandong Province
02 More efficient and stable
03 High degree of automation, intelligent design, reducing manual labor
04 70% of products are shipped to countries and regions such as Europe, America, the Middle East, Central Asia, Africa, Russia, etc
05 High market share
On March 21, Qingdao Huashida 3PE Steel Pipe Anti-corrosion Machine Line were loaded from the factory area, and three trucks were gradually dispatched to Kazakhstan. This is another export of Qingdao Huashida to Kazakhstan. After receiving the order at the end of last year, the company immediately organized a project kickoff meeting. Sort out the equipment list in detail, develop specific production plans, and purchase raw materials from the procurement department. During the production process, the project team held several promotion meetings, strictly following the process standards and increasing inspection efforts. At the beginning of this year, Huashida was busy preparing for production and manufacturing, completing the project before the specified deadline and delivering the goods on time.